2010-10-12 Rope Rescue training
From PCSAR
(Difference between revisions)
Line 6: | Line 6: | ||
Agenda: | Agenda: | ||
- | *Raising Systems | + | * Raising Systems |
** (from BC PEP RRM Chapter 8) | ** (from BC PEP RRM Chapter 8) | ||
** Describe safety considerations in raising systems | ** Describe safety considerations in raising systems | ||
Line 16: | Line 16: | ||
Covered: | Covered: | ||
- | + | * Raising Systems | |
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | + | ||
- | *Raising Systems | + | |
** (from BC PEP RRM Chapter 8) | ** (from BC PEP RRM Chapter 8) | ||
** Describe safety considerations in raising systems | ** Describe safety considerations in raising systems |
Revision as of 23:32, 9 November 2010
Tuesday October 12, 2010
19:00 - 21:00 at the Fire Hall
Rope Rescue practice.
Agenda:
- Raising Systems
- (from BC PEP RRM Chapter 8)
- Describe safety considerations in raising systems
- Describe the principles and applications of mechanical advantage systems
- Build simple pulley systems, 2:1, 3:1, 5:1
- Build compound pulley systems
- Convert a lower to a raise under tension
- Efficiently pass knots in the load line while raising
Covered:
- Raising Systems
- (from BC PEP RRM Chapter 8)
- Describe safety considerations in raising systems
- Describe the principles and applications of mechanical advantage systems
- Build simple pulley systems, 2:1, 3:1, 5:1
- Build compound pulley systems
- Convert a lower to a raise under tension