2010-10-12 Rope Rescue training

From PCSAR

(Difference between revisions)
Jump to: navigation, search
Current revision (00:19, 10 November 2010) (edit) (undo)
 
(2 intermediate revisions not shown.)
Line 6: Line 6:
Agenda:
Agenda:
-
*Raising Systems
+
* Raising Systems
** (from BC PEP RRM Chapter 8)
** (from BC PEP RRM Chapter 8)
** Describe safety considerations in raising systems
** Describe safety considerations in raising systems
Line 14: Line 14:
** Convert a lower to a raise under tension
** Convert a lower to a raise under tension
** Efficiently pass knots in the load line while raising
** Efficiently pass knots in the load line while raising
 +
 +
Covered:
 +
* Raising Systems
 +
** (from BC PEP RRM Chapter 8)
 +
** Describe safety considerations in raising systems
 +
** Describe the principles and applications of mechanical advantage systems
 +
** Build simple pulley systems, 2:1, 3:1, 5:1
 +
** Build compound pulley systems
 +
** Convert a lower to a raise under tension
 +
 +
{{link|Image:Rope:2010-11-09 22 51 33u-scan.pdf}}

Current revision

Tuesday October 12, 2010

19:00 - 21:00 at the Fire Hall

Rope Rescue practice.

Agenda:

  • Raising Systems
    • (from BC PEP RRM Chapter 8)
    • Describe safety considerations in raising systems
    • Describe the principles and applications of mechanical advantage systems
    • Build simple pulley systems, 2:1, 3:1, 5:1
    • Build compound pulley systems
    • Convert a lower to a raise under tension
    • Efficiently pass knots in the load line while raising

Covered:

  • Raising Systems
    • (from BC PEP RRM Chapter 8)
    • Describe safety considerations in raising systems
    • Describe the principles and applications of mechanical advantage systems
    • Build simple pulley systems, 2:1, 3:1, 5:1
    • Build compound pulley systems
    • Convert a lower to a raise under tension

2010-10-12 rope rescue practice sign-in

Personal tools