2010-08-10 Rope Rescue training
From PCSAR
(Difference between revisions)
Line 33: | Line 33: | ||
** Thread and tie-off a brake rack | ** Thread and tie-off a brake rack | ||
- | {{link|Image: | + | {{link|Image:Rope:2010-08-11 04 51 21u-scan.pdf}} |
Current revision
Tuesday August 10, 2010
19:00 - 21:00 at the Fire Hall
Rope Rescue practice.
Agenda:
- Anchor Systems
- (from BC PEP RRM Chapter 5)
- Select appropriate natural anchors
- Define the principles and considerations of anchor construction
- Build different anchor point attachments
- Build multipoint anchor systems
- Extend anchor systems
- Describe the effect of angles on anchor legs
- Lowers
- (from BC PEP RRM Chapter 7)
- Describe the principles behind lowering systems
- Describe the different lowering devices and their limitations
- Thread and tie-off a brake rack
- Efficiently pass a knot in the load line during a lower
Covered:
- Anchor Systems
- (from BC PEP RRM Chapter 5)
- Define the principles and considerations of anchor construction
- Build different anchor point attachments
- Describe the effect of angles on anchor legs
- Lowers
- (from BC PEP RRM Chapter 7)
- Describe the principles behind lowering systems
- Describe the different lowering devices and their limitations
- Thread and tie-off a brake rack