Critiques/2010-08-24/Sug/0004
From PCSAR
< Critiques | 2010-08-24(Difference between revisions)
(New page: {{sug|4|val=high|dif=easy|Equipment in SAR Car should include Heat Blankets and Hot Packs.}} Action: check out and procure this survival equipment.) |
m (Critiques/2010-08-24/Sug4 moved to Critiques/2010-08-24/Sug/0004) |
||
(2 intermediate revisions not shown.) | |||
Line 1: | Line 1: | ||
- | {{sug|4|val=high|dif= | + | {{sug|4|val=high|dif=medium|cmte=equipment|Equipment in SARCAR and Equipment Trailer should include Heat Blankets and Hot Packs.}} |
+ | Fire Chief has offered hot packs. | ||
+ | |||
+ | Hypothermia kits can't freeze so stored in Fire Hall. | ||
+ | |||
+ | Rejected: understand why kits can't freeze and see if constraint can be ignored. | ||
+ | |||
+ | Consider: heated container in equipment trailer allowing equipment that require minimum temperature to be kept there year round. | ||
+ | |||
Action: check out and procure this survival equipment. | Action: check out and procure this survival equipment. | ||
+ | |||
+ | Reviewed at [[Members:Preplan/2010-10-19|2010-10-19 Preplan meeting]]. |
Current revision
Suggestion #4: Equipment in SARCAR and Equipment Trailer should include Heat Blankets and Hot Packs.
- Committee handling: equipment
- Value to PCSAR mandate: high
- Difficulty to implement: medium
Fire Chief has offered hot packs.
Hypothermia kits can't freeze so stored in Fire Hall.
Rejected: understand why kits can't freeze and see if constraint can be ignored.
Consider: heated container in equipment trailer allowing equipment that require minimum temperature to be kept there year round.
Action: check out and procure this survival equipment.
Reviewed at 2010-10-19 Preplan meeting.
Facts about Critiques/2010-08-24/Sug/0004RDF feed
Committee handling | Suggestion/Committee/List/equipment + |
Description | Equipment in SARCAR and Equipment Trailer should include Heat Blankets and Hot Packs. + |
Difficulty to implement | medium + |
Full page name | Critiques/2010-08-24/Sug/0004 + |
Sequence number | 4 + |
Suggestion list | Critiques/2010-08-24 + |
Value to PCSAR mandate | high + |