Critiques/2010-08-24/Sug/0004

From PCSAR

< Critiques | 2010-08-24(Difference between revisions)
Jump to: navigation, search
(New page: {{sug|4|val=high|dif=easy|Equipment in SAR Car should include Heat Blankets and Hot Packs.}} Action: check out and procure this survival equipment.)
Current revision (04:40, 21 May 2014) (edit) (undo)
 
(2 intermediate revisions not shown.)
Line 1: Line 1:
-
{{sug|4|val=high|dif=easy|Equipment in SAR Car should include Heat Blankets and Hot Packs.}}
+
{{sug|4|val=high|dif=medium|cmte=equipment|Equipment in SARCAR and Equipment Trailer should include Heat Blankets and Hot Packs.}}
 +
Fire Chief has offered hot packs.
 +
 
 +
Hypothermia kits can't freeze so stored in Fire Hall.
 +
 
 +
Rejected: understand why kits can't freeze and see if constraint can be ignored.
 +
 
 +
Consider: heated container in equipment trailer allowing equipment that require minimum temperature to be kept there year round.
 +
 
Action: check out and procure this survival equipment.
Action: check out and procure this survival equipment.
 +
 +
Reviewed at [[Members:Preplan/2010-10-19|2010-10-19 Preplan meeting]].

Current revision


Suggestion #4: Equipment in SARCAR and Equipment Trailer should include Heat Blankets and Hot Packs.

Committee handling: equipment
Value to PCSAR mandate: high
Difficulty to implement: medium

Fire Chief has offered hot packs.

Hypothermia kits can't freeze so stored in Fire Hall.

Rejected: understand why kits can't freeze and see if constraint can be ignored.

Consider: heated container in equipment trailer allowing equipment that require minimum temperature to be kept there year round.

Action: check out and procure this survival equipment.

Reviewed at 2010-10-19 Preplan meeting.

Facts about Critiques/2010-08-24/Sug/0004RDF feed
Committee handling Suggestion/Committee/List/equipment  +
Description Equipment in SARCAR and Equipment Trailer should include Heat Blankets and Hot Packs.  +
Difficulty to implement medium  +
Full page name Critiques/2010-08-24/Sug/0004  +
Sequence number 4  +
Suggestion list Critiques/2010-08-24  +
Value to PCSAR mandate high  +