Search Manager/Kit/Introduction

From PCSAR

(Difference between revisions)
Jump to: navigation, search
(Contents)
(Contents)
Line 45: Line 45:
* PCSAR DOC-91 Segment
* PCSAR DOC-91 Segment
* PCSAR DOC-90 Initial POA
* PCSAR DOC-90 Initial POA
-
* PCSAR DOC-87 Logistical Needs
+
* [[PCSAR DOC-87 Logistical Needs]] (5 copies)
* PCSAR DOC-88 Logistical Resource
* PCSAR DOC-88 Logistical Resource
* Current SAR Alberta emergency contact list http://www.saralberta.org/emergency/
* Current SAR Alberta emergency contact list http://www.saralberta.org/emergency/

Revision as of 19:27, 28 August 2011

Welcome to the Pincher Creek Search and Rescue (PCSAR) Manager's Kit.

The most up to date version of this page is available on the PCSAR web site at http://pcsar.webhop.org/zope/wiki/ManagerKitTask

The PCSAR Manager's Kit is intended to be used by PCSAR's SAR Managers to familiarize them with the forms used by PCSAR. All of these forms are available in multiple copies found in the filing cabinet on PCSAR's mobile command post (bus) and in the overhead team box found in SAR cabinet upstairs at the FireHall.

The Kit will also act as the seed for your personal ready kit. You will however need to make additional copies of the forms. (All forms are downloadable from the PCSAR website starting at http://pcsar.webhop.org/documents.html) You probably will also want to augment your kit with other material you find personally useful.

Contents

The contents are ordered roughly in the sequence they would be used.

  • This page
  • PCSAR DOC-32 Initial Response Incident Commanders List of ``Must Do's
  • PCSAR DOC-01 Search Urgency Doc-01 before Doc-33 because Search Urgency will be the first thing the search manager will be thinking about.
  • PCSAR DOC-33 First Notice Record
  • PCSAR DOC-84 Missing Person Profile
  • PCSAR DOC-14 Supplementary Lost Snowmobiler Questionnaire
  • PCSAR DOC-13 Lost/Missing Person Report and Search Results
  • Current Call Out List
  • PCSAR DOC-67 Emergency Call Out Procedure (Please write down the telephone passcode in step 4d.)
  • PCSAR DOC-76 Action Plan
  • PCSAR DOC-62 Registration/Sign-In
  • PCSAR DOC-70 Scenario (5 copies)
  • PCSAR DOC-61 Task Assignment/Debriefing (5 copies) [DiscussionDoc61]
    • Five copies would be the minimum to start initial op period.
  • PCSAR DOC-89 Logistics Expected Timeline

The Kit is currently provided as loose pages without a binder. The PreplanCommittee feels that most SAR Managers already have a suitable binder.

Personal tools