2010-01-12 Rope Rescue training
From PCSAR
(Difference between revisions)
Line 11: | Line 11: | ||
** review last month | ** review last month | ||
** Assess rescue terrain | ** Assess rescue terrain | ||
+ | |||
+ | * math for calculation of load and angles | ||
* Knots, Bends and Hitches | * Knots, Bends and Hitches |
Revision as of 23:21, 11 January 2010
Tuesday January 12, 2010
19:00 - 21:00 at the Fire Hall
Rope Rescue practice.
Agenda:
- Rescue Site Overview
- (from BC PEP RRM Chapter 2)
- review last month
- Assess rescue terrain
- math for calculation of load and angles
- Knots, Bends and Hitches
- (from BC PEP RRM Chapter 4)
- Utilize proper knot terminology
- Demonstrate the following knots and ties:
- Water or tape bend
- Figure-eight-on-a-bight
- Figure-eight-follow-through
- Figure-eight-follow-through bend
- Fishermans bend
- Prusik hitch
- Prusik-on-itself
- Italian hitch
- Blocking knot
- Clove hitch
- Radium release hitch
- Inline figure eight
- Butterfly knot
- Block and tackle
- Properly stack and coil rope
- Integrate seat and chest harnesses
- Examine a complete system