2010-05-11 Rope Rescue training
From PCSAR
(Difference between revisions)
Line 14: | Line 14: | ||
** Set up and operate Prusiks and mechanical devices for ascending | ** Set up and operate Prusiks and mechanical devices for ascending | ||
** Perform safety checks for rappelling / ascending systems | ** Perform safety checks for rappelling / ascending systems | ||
+ | |||
+ | Covered: | ||
+ | * built lower system with brake bar, main line and belay | ||
+ | * demonstrated ascending with prusiks and mechanical ascenders, down climbed |
Revision as of 04:44, 9 June 2010
Tuesday May 11, 2010
19:00 - 21:00 at the Fire Hall
Rope Rescue practice.
Agenda:
- Rappelling and Ascending
- (from BC PEP RRM Chapter 10)
- Understanding rappelling methods
- Outline the various belay methods
- Set up and operate various rappel devices
- Tie-off rappel devices
- Set up and operate Prusiks and mechanical devices for ascending
- Perform safety checks for rappelling / ascending systems
Covered:
- built lower system with brake bar, main line and belay
- demonstrated ascending with prusiks and mechanical ascenders, down climbed