2010-08-10 Rope Rescue training

From PCSAR

Revision as of 19:09, 11 January 2011 by Brett Wuth (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

Tuesday August 10, 2010

19:00 - 21:00 at the Fire Hall

Rope Rescue practice.

Agenda:

  • Anchor Systems
    • (from BC PEP RRM Chapter 5)
    • Select appropriate natural anchors
    • Define the principles and considerations of anchor construction
    • Build different anchor point attachments
    • Build multipoint anchor systems
    • Extend anchor systems
    • Describe the effect of angles on anchor legs
  • Lowers
    • (from BC PEP RRM Chapter 7)
    • Describe the principles behind lowering systems
    • Describe the different lowering devices and their limitations
    • Thread and tie-off a brake rack
    • Efficiently pass a knot in the load line during a lower

Covered:

  • Anchor Systems
    • (from BC PEP RRM Chapter 5)
    • Define the principles and considerations of anchor construction
    • Build different anchor point attachments
    • Describe the effect of angles on anchor legs
  • Lowers
    • (from BC PEP RRM Chapter 7)
    • Describe the principles behind lowering systems
    • Describe the different lowering devices and their limitations
    • Thread and tie-off a brake rack

2010-08-10 rope-rescue sign-in

Personal tools