Editing 2010-10-12 Rope Rescue training
From PCSAR
Warning: You are not logged in. Your IP address will be recorded in this page's edit history.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Current revision | Your text | ||
Line 6: | Line 6: | ||
Agenda: | Agenda: | ||
- | * Raising Systems | + | *Raising Systems |
** (from BC PEP RRM Chapter 8) | ** (from BC PEP RRM Chapter 8) | ||
** Describe safety considerations in raising systems | ** Describe safety considerations in raising systems | ||
Line 16: | Line 16: | ||
Covered: | Covered: | ||
- | * Raising Systems | + | *Raising Systems |
+ | ** (from BC PEP RRM Chapter 8) | ||
+ | ** Describe safety considerations in raising systems | ||
+ | ** Describe the principles and applications of mechanical advantage systems | ||
+ | ** Build simple pulley systems, 2:1, 3:1, 5:1 | ||
+ | ** Build compound pulley systems | ||
+ | ** Convert a lower to a raise under tension | ||
+ | *Raising Systems | ||
** (from BC PEP RRM Chapter 8) | ** (from BC PEP RRM Chapter 8) | ||
** Describe safety considerations in raising systems | ** Describe safety considerations in raising systems |