Editing 2012-05-12 Mock/Exercise plan
From PCSAR
Warning: You are not logged in. Your IP address will be recorded in this page's edit history.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Current revision | Your text | ||
Line 203: | Line 203: | ||
As is the nature of ICS, if no one is assigned to a specific role, | As is the nature of ICS, if no one is assigned to a specific role, | ||
all of those functions are to be carried out by the next senior role | all of those functions are to be carried out by the next senior role | ||
- | with the ICS structure | + | with the ICS structure. |
=== Agency Executive === | === Agency Executive === |