Editing Overhead Role Package Task

From PCSAR

Jump to: navigation, search

Warning: You are not logged in. Your IP address will be recorded in this page's edit history.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.

Current revision Your text
Line 1: Line 1:
Create sealed packages for each overhead team member role
Create sealed packages for each overhead team member role
-
* Each package contains all materials needed for that role for one operational period (froms, pens, etc.)
+
* Each package contains all materials needed for that role for
-
* Seal packages so user knows they are complete
+
one operational period (froms, pens, etc.)* Seal packages so user knows they are complete* Determine what materials each role needs* Determine how many operational periods to be prepared for* Buy the materials and photocopy documents needed* Prepare packages* Prepare instructions for re-supplyingReevaluated by the [[PreplanCommittee]] 2004-09: Doesn't give
-
* Determine what materials each role needs
+
-
* Determine how many operational periods to be prepared for
+
-
* Buy the materials and photocopy documents needed
+
-
* Prepare packages
+
-
* Prepare instructions for re-supplying
+
-
 
+
-
Reevaluated by the [[PreplanCommittee]] 2004-09: Doesn't give
+
extra value. Better to have better understanding of current hanging
extra value. Better to have better understanding of current hanging
file system
file system

Please note that all contributions to PCSAR are considered to be released under the Attribution-Share Alike 3.0 Unported (see PCSAR:Copyrights for details). If you don't want your writing to be edited mercilessly and redistributed at will, then don't submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. DO NOT SUBMIT COPYRIGHTED WORK WITHOUT PERMISSION!


Cancel | Editing help (opens in new window)
Personal tools