Editing Overhead Role Package Task
From PCSAR
Warning: You are not logged in. Your IP address will be recorded in this page's edit history.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Current revision | Your text | ||
Line 1: | Line 1: | ||
Create sealed packages for each overhead team member role | Create sealed packages for each overhead team member role | ||
- | * Each package contains all materials needed for that role for one operational period (froms, pens, etc.) | + | * Each package contains all materials needed for that role for |
- | * Seal packages so user knows they are complete | + | one operational period (froms, pens, etc.)* Seal packages so user knows they are complete* Determine what materials each role needs* Determine how many operational periods to be prepared for* Buy the materials and photocopy documents needed* Prepare packages* Prepare instructions for re-supplyingReevaluated by the [[PreplanCommittee]] 2004-09: Doesn't give |
- | * Determine what materials each role needs | + | |
- | * Determine how many operational periods to be prepared for | + | |
- | * Buy the materials and photocopy documents needed | + | |
- | * Prepare packages | + | |
- | * Prepare instructions for re- | + | |
- | + | ||
- | + | ||
extra value. Better to have better understanding of current hanging | extra value. Better to have better understanding of current hanging | ||
file system | file system |