Property:Description

From PCSAR

Jump to: navigation, search

string

Facts about DescriptionRDF feed
Has typeThis property is a special property in this wiki.StringThis type is among the standard datatypes of this wiki.

(previous 25) (next 25)

Pages using the property "Description"

Showing 25 pages using this property.

2

2012-10-02 Mock/Critque/Sug2 +Couldn't open the door. Need orientation.  +
2012-10-02 Mock/Critque/Sug20 +MCP needs better place to hang radio mic cord, or perhaps a longer cord, or bungie cord  +
2012-10-02 Mock/Critque/Sug21 +The MCP map table was good.  +
2012-10-02 Mock/Critque/Sug22 +MCP radio needs headset  +
2012-10-02 Mock/Critque/Sug23 +There's a leak in the MCP  +
2012-10-02 Mock/Critque/Sug24 +The heat in the MCP works well  +
2012-10-02 Mock/Critque/Sug25 +TL strategized by distance would have to travel to various assigned search locales  +
2012-10-02 Mock/Critque/Sug26 +Urban search should anticipate may have to search open buildings or buildings that have subsequently locked  +
2012-10-02 Mock/Critque/Sug27 +urban searching done by vehicle  +
2012-10-02 Mock/Critque/Sug28 +use of dog in urban search; can handle large area  +
2012-10-02 Mock/Critque/Sug29 +the search segment was too large to be searched  +
2012-10-02 Mock/Critque/Sug3 +Move CP to LKP  +
2012-10-02 Mock/Critque/Sug30 +need training on radio protocol  +
2012-10-02 Mock/Critque/Sug31 +Exercise felt disjointed; RCMP usually are involved earlier in incident  +
2012-10-02 Mock/Critque/Sug32 +there should be a bigger turn out to training events  +
2012-10-02 Mock/Critque/Sug33 +Teams in field should stick to assigned tasks, refer back to CP with changes.  +
2012-10-02 Mock/Critque/Sug34 +difficulty with only 2 teams  +
2012-10-02 Mock/Critque/Sug35 +Need clarity when 2 teams come under one team leader  +
2012-10-02 Mock/Critque/Sug36 +technology always fails; e.g. radio, cell  +
2012-10-02 Mock/Critque/Sug4 +time spent looking for stuff in CP  +
2012-10-02 Mock/Critque/Sug5 +weather limited ability to track  +
2012-10-02 Mock/Critque/Sug6 +new CP worked well; radios good; cell phone good  +
2012-10-02 Mock/Critque/Sug7 +Only team leaders should be in new command post; room is limited.  +
2012-10-02 Mock/Critque/Sug8 +It was not clear what operational activities should be simulated, e.g. medical/stretcher equipment  +
2012-10-02 Mock/Critque/Sug9 +exercise should change size depending on number of teams available  +
(previous 25) (next 25)
Personal tools