Editing Protocols/Shell H2S
From PCSAR
Warning: You are not logged in. Your IP address will be recorded in this page's edit history.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Current revision | Your text | ||
Line 145: | Line 145: | ||
#* ''Rationale: This will provide liability and WCB coverage.'' | #* ''Rationale: This will provide liability and WCB coverage.'' | ||
# The RCMP member tasks Pincher SAR to respond. | # The RCMP member tasks Pincher SAR to respond. | ||
- | # The PCSAR Manager puts a PCSAR Call-Out Person on stand-by. In incidents that start at Level 2 or higher, the PCSAR Manager requests the entire team and possibly neighboring teams to stage at (e.g.) the Pincher Fire Hall or to be on standby. | + | # The PCSAR Manager puts a PCSAR Call-Out Person on stand-by. In incidents that start at Level 2 or higher, the PCSAR Manager requests the entire team and possibly neighboring teams to stage at (e.g.) the Pincher Fire Hall (or to be on standby). |
# The PCSAR Manager attends the Incident Command Post and assumes the ICS role of Technical Advisor on SAR. | # The PCSAR Manager attends the Incident Command Post and assumes the ICS role of Technical Advisor on SAR. | ||
# The PCSAR Manager maintains an awareness of the efforts to notify the public at Level 1 (rovers) and as appropriate to the evolving situation, has PCSAR members put on stand-by. | # The PCSAR Manager maintains an awareness of the efforts to notify the public at Level 1 (rovers) and as appropriate to the evolving situation, has PCSAR members put on stand-by. |