Editing Training/Ideas/Leadership

From PCSAR

Jump to: navigation, search

Warning: You are not logged in. Your IP address will be recorded in this page's edit history.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.

Current revision Your text
Line 1: Line 1:
-
{{Training Subject/Header}} <!-- keep this line -->
+
eadership
-
[[Category:Classroom setting]]
+
-
== Description ==
+
-
{{Training Subject/Description}} <!-- keep this line -->
+
-
type:
+
-
* evening training
+
-
* certificate course
+
-
 
+
-
== Need ==
+
-
* {{subpage|Interest|List of people wanting this training}}
+
-
 
+
-
== Sources ==
+
-
{{Training Subject/Sources}} <!-- keep this line -->
+
-
== Material ==
+
-
{{Training Subject/Material}} <!-- keep this line -->
+
-
 
+
{{/Sug list|
{{/Sug list|
[[2012-10-02 Mock/Critque/Sug35]]
[[2012-10-02 Mock/Critque/Sug35]]
Line 28: Line 13:
* [http://www.youtube.com/watch?v=JC6gMrAcvSA JIBC TL video]
* [http://www.youtube.com/watch?v=JC6gMrAcvSA JIBC TL video]
-
** 41 minutes
 
-
** good video for thought provoking experienced leaders
 
-
** not good for general membership because several prominent but minor flaws
 
-
** clips could be used for various purposes
 
-
** actors feels overly structured, distracts from message
 
-
** longer preparation before deployment
 
-
** BC TL standard
 
-
** interoperability
 
-
** SMEAC breafing
 
-
** Phase 1: Planning & Preparation
 
-
*** Initial Preparation
 
-
*** Assistant TL
 
-
*** Review Map
 
-
*** Time Assessment
 
-
*** Select Briefing Area
 
-
*** Initial Plan
 
-
*** Prepare ATL briefing
 
-
**** General Situation
 
-
**** Mission: who what, where, POD
 
-
**** Personnel - ATL to get qualification
 
-
**** Team Briefieng - Quiet and protected area
 
-
**** Equipment Needed
 
-
**** Special Instructions
 
-
*** Detailed Planning
 
-
**** Detailed Map Review
 
-
**** Detailed Time Estimate
 
-
**** Detailed Plan by Phase
 
-
**** Forward Planning
 
-
**** SMEAC
 
-
** Phase 2: Move to Mission Area
 
-
** Phase 3: Complete the Mission
 
-
** Phase 4: Return to Base
 
-
** Phase 5: Post-Mission Procedures
 
-
*** Debriefing the Team
 
-
*** Report ot SAR Management Team
 
-
*** Report back to Team
 
-
== Financial ==
 
-
{{Training Subject/Funding}} <!-- keep this line -->
 
-
== Runnings ==
 
-
{{Training Subject/Runnings}} <!-- keep this line -->
 
* [[2014-05-06 regular training]]
* [[2014-05-06 regular training]]
* [[2000-12-05 being in charge]]
* [[2000-12-05 being in charge]]
-
 
-
 
-
== Reports ==
 
-
{{Training Subject/Reports}} <!-- keep this line -->
 

Please note that all contributions to PCSAR are considered to be released under the Attribution-Share Alike 3.0 Unported (see PCSAR:Copyrights for details). If you don't want your writing to be edited mercilessly and redistributed at will, then don't submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource. DO NOT SUBMIT COPYRIGHTED WORK WITHOUT PERMISSION!


Cancel | Editing help (opens in new window)
Personal tools