2010-12-14 Rope Rescue training

From PCSAR

Jump to: navigation, search

Tuesday December 14, 2010

19:00 - 21:00 at the Fire Hall

Rope Rescue practice.

Agenda:

  • Rope Rescue in Pincher Creek
    • (from BC PEP RRM Chapter 1)
    • Describe the Incident Commander's role in rope rescue
  • Raising Systems
    • (from BC PEP RRM Chapter 8)
    • Efficiently pass knots in the load line while raising
  • Slope Rescue
    • (from BC PEP RRM Chapter 12)
    • Describe techniques to operate safely and proficiently on slopes ranging from very low angle to steep angle
    • Adapt techniques used in vertical rescue
    • Describe forces encountered during a slope rescue
    • Describe hazards particular to slope rescue


Covered:

  • review call-out in November
  • discuss protocol to use private vehicles to attend PCES incidents
  • discuss notification system
  • Slope Rescue
    • (from BC PEP RRM Chapter 12)
    • Describe techniques to operate safely and proficiently on slopes ranging from very low angle to steep angle
    • Adapt techniques used in vertical rescue
    • Describe forces encountered during a slope rescue
    • Describe hazards particular to slope rescue
Personal tools