Rope Rescue

From PCSAR

Revision as of 05:54, 13 September 2010 by Brett Wuth (Talk | contribs)
Jump to: navigation, search

PCSAR and Pincher Creek Emergency Services are forming a joint rope rescue team. It is hoped that by having a single team between the two organizations, that we will be able to maintain a level of training and involvement that will allow the joint team to respond to incidents in the mandate for either organization.

The PCSAR board has given approval in principle to the formation of joint team. They will consider a more detailed mandate and budget for the team as they are developed.

Contents

Joining

If you are interested in becoming involved in the joint team, contact Brett Wuth as a member of PCSAR, or your officers as a member of Emergency Services.

PCSAR members interested:

  • Brett Wuth
  • Lyle Korver
  • Bree Korobanik
  • Brian Balak
  • Ron Hann
  • Forest Anderson

Planning

A joint planning meeting between PCSAR, PCES, Piikani Fire Dept and Shell was held 2009-08-19.

A planning session was held after the wind turbine tour on 2009-09-12 between Dave Cox, Brett Wuth, Bree Korobanik, and Brian Balak.

2009-09-16 Pat and Brett discussed training requirements.

2009-10-13 Pat and Brett worked on a training schedule.

2009-11-05 Dave, Pat and Brett planned the 2009-11-10 meeting.

More planning sessions are anticipated. Contact Brett Wuth if you'd like to participate.

To do

  • liabilities (Dave)
  • explore financing options through Councils, AEMA, etc. (Dave)
  • once financing is known inquire with professional instructors for spring course (Brett, Pat)
  • construct anchor points at fire hall for practices (Dave, Pat, Brett)
  • recruitment (Bree, Brian)
  • work training schedule forward for rest of 2010 (Pat, Brett by January 2010)
  • standards
  • equipment
  • regional mutual aid
  • response capability
    • response time
    • radios
    • schedule
    • on-call/coverage
  • paid vs unpaid

Needs Analysis

Forecast of Incidents

PCSAR

  • Self Rescue (1 / 10 yr)
    • Searches often include steep areas where a searcher could potential have a mishap and require rescuing. Although searchers are trained and directed to avoid these hazards, PCSAR is better for having self-rescue capability should such an mishap occur.
  • Wilderness low angle (1 / 5 yr)
    • A rescue occurs in a remote area where a person needs to be stretchered over low-angle terrain.
  • Wilderness high angle (1 / 10 yr)
    • A rescue occurs where a person needs to be extracted from a steep slope or high-angle terrain. Stretcher may not be necessary, but the person cannot move safely without rope.
  • Caves (1 / 5 yr)
    • The Crowsnest Pass is a prime area for novice and skilled cave trips. Many rope rescue responders are required inside the cave and possibly outside it. Typical responders are CNP SAR and ACRO. PCSAR could assist. Out-of-region illustration: Fang Cave Rescue
  • Avalanche (0)
    • Avalanche response are unlikely to require rope rescue skills

PCES

  • accessible embankment (2 / yr)
    • person or vehicle down embankment. Low angle techniques needed to safely extract.
  • high angle (1 / 5 yr)
  • bridges (1 / 3 yr)
    • A vehicle goes off a bridge deck and patient requires vertical raise.

Shell

  • Above 40 feet (1 / 10 yr)
  • Confined (1 / 5 yr)

Transalta

  • Wind Turbine (1 / 10 yr)
  • Communication towers ?

Canadian Hydro

  •  ?

Enmax

  •  ?

Estimated average total of incidents per year: 3.4

Other responders

If a rope rescue team did not exist in our area, responses might be available from:

  • CNP
  • Waterton
  • Fernie
  • Kananaskis
  • Banff

Responders required

  • 1 person at "Team Leader" level
    • Able to direct and oversee the whole rope rescue.
  • 3 people at "Team Member" level
    • Able to build and operate any station
  • 2 people at "Basic Skills" level
    • Able to assist under direction

Roster requirements

Estimating that 1/3 of members are able to respond at any given time. Estimate is the same for both PCES and PCSAR members.

  • Team Leader level: 3
  • Team Member level: 9
  • Basic Skills: 6 (but probably have lots)

Attrition:

Estimate that there is a 1 in 6 chance each year that any person on the roster (at any level) will leave or no longer be available and have to be replaced.

Training

Training time and dollar budget

  • Basic Skills
    • estimated 4 hours of in-house training
    • most PCES have already been taught (S-300 course)
    • maintain skills
      • 2 hours per year
      • in-house refresher
    • roster: ~20
  • Team Member
    • estimated total: 100 hours of in-house training, formal course, and practice
    • take a decent course
    • maintain skills
      • 20 hours practice per year
      • e.g. scenarios
    • roster: 9
      • attrition: 1.5 every year
  • Team Leader
    • estimated total: 200 hours of in-house training, formal course, and practice
    • experience
    • maintain skills
      • 30 hours practice per year
      • e.g. scenarios
    • roster: 3
      • attrition: 1 every 2 years


totals:

  • initial: ~1580 person*hr (less training people already have)
  • maintain: ~310 person*hr/yr
  • replacement: ~250 person*hr/yr (less training recruits already have)

Subject matter

Potential training subjects:

  • formal course
  • basic skills
    • equipment checking (i.e. checking ropes)
    • handling rope
    • knowing parts, gear recognition
    • anchors
    • stretcher tie-in
  • practice scenarios
  • site safety assessment
  • a helicopter safety talk

In-house training

In-house training syllabus (from BC PEP Rope Rescue Manual):


Rope Rescue in Pincher Creek

  • scheduled to cover during 2010-11-09 Rope Rescue training
  • (from BC PEP RRM Chapter 1)
  • How rope rescue relates to SAR / Emergency Services
  • Describe the training process of a rope rescue Team Member
  • Describe the training process of a rope rescue Team Leader
  • Describe the Incident Commander's role in rope rescue


Rescue Site Overview

  • covered during 2009-12-08 Rope Rescue training, 2010-01-12 Rope Rescue training
  • (from BC PEP RRM Chapter 2)
  • Describe zones of the rescue site
  • Describe rescue organization
  • Describe the roles of rescue personnel
  • Describe hazard assessment
  • Assess rescue terrain
  • Describe the standards of Rope Rescue
  • Outline the principles of rope rescue
  • Determine forces on the rescue system


Equipment

  • covered during 2010-03-09 Rope Rescue training
  • (from BC PEP RRM Chapter 3)
  • Describe the safe working load limits of rescue equipment and systems
  • Describe the properties, use and proper care of:
    • High stretch and low stretch rope
    • Webbing and sling material
    • Accessory cord
    • Pulleys
    • Rigging plates
    • Personal descenders
    • Rescue brake bar racks
    • Edge protection
    • Personal ascending devices
    • Helmets
    • Harnesses
    • Gloves


Knots, Bends and Hitches


Anchor Systems

  • covered during 2010-08-10 Rope Rescue training
  • scheduled to cover during 2010-09-14 Rope Rescue training
  • (from BC PEP RRM Chapter 5)
  • Select appropriate natural anchors
  • Define the principles and considerations of anchor construction
  • Build different anchor point attachments
  • Build multipoint anchor systems
  • Extend anchor systems
  • Describe the effect of angles on anchor legs


Belay Systems


Lowers


Raising Systems

  • scheduled to cover during 2010-10-12 Rope Rescue training
  • (from BC PEP RRM Chapter 8)
  • Describe safety considerations in raising systems
  • Describe the principles and applications of mechanical advantage systems
  • Build simple pulley systems, 2:1, 3:1, 5:1
  • Build compound pulley systems
  • Convert a lower to a raise under tension
  • Efficiently pass knots in a the load line while raising


Stretcher Rigging

  • scheduled to cover in 2011-01-11 Rope Rescue training
  • (from BC PEP RRM Chapter 9)
  • Describe litter models available for rope rescue
  • Rig stretcher bridle attachments
  • Attach load and belay ropes to the stretcher
  • Construct attendant and subject stretcher tie-ins
  • Demonstrate stretcher handling techniques
  • Demonstrate subject securement techniques


Rappelling and Ascending

  • covered during 2010-05-11 Rope Rescue training, 2010-06-08 Rope Rescue training
  • (from BC PEP RRM Chapter 10)
  • Understanding rappelling methods
  • Outline the various belay methods
  • Set up and operate various rappel devices
  • Tie-off rappel devices
  • Set up and operate Prusiks and mechanical devices for ascending
  • Perform safety checks for rapperlling / ascending systems


Communications

  • scheduled to cover during 2010-11-09 Rope Rescue training
  • (from BC PEP RRM Chapter 11)
  • Describe the need for clear, standard terminology and protocols
  • Use verbal rescue signals proficiently
  • Use whistle rescue signals proficiently


Slope Rescue

  • scheduled to cover in 2010-12-14 Rope Rescue training
  • (from BC PEP RRM Chapter 12)
  • Describe techniques to operate safely and proficiently on slopes ranging from very low angle to steep angle
  • Adapt techniques used in vertical rescue
  • Describe forces encountered during a slope rescue
  • Describe hazards particular to slope rescue


Pick-off Techniques

  • scheduled to cover in 2011-02-08 Rope Rescue training
  • (from BC PEP RRM Chapter 13)
  • Outline when pick-off techniques should be used
  • Perform lowering pick-offs
  • Perform rappel pick-offs
  • Demonstrate subject positioning options
  • Perform stretcher tilt-lift pick-offs


Rescue Operations

  • scheduled to cover during 2010-11-09 Rope Rescue training
  • (from BC PEP RRM Chapter 14)
  • Describe the need and process of preplanning
  • Outline the role of the Initial Response Team
  • Describe the elements of a successful rope rescue

Schedule

In addition to what's below, PCES will use 20 minutes of every second regular training night to review basic rope skills.

We train the evenings of the 2nd Tuesday of the month.

Past:

Upcoming:

Equipment

Personal tools